Project in the Business Area: Solar Thermal Power Plants and Industrial Processes, Topic: Concentrating Solar Collectors, Duration: 07/2019 - 07/2023
more infoTwo prototypes of the AVUS measurement system under field testing at the CSP plant “Andasol 3” in southern Spain. On the top the exposed mirror fixed to the pivot arm (upper right). At the bottom of the front side the measurement port where the sample is regularly pivoted to.
Project in the Business Area: Solar Thermal Power Plants and Industrial Processes, Topic: Concentrating Solar Collectors, Duration: 07/2019 - 07/2023
more infoHaiXi 50MW Solar Tower plant, where NWEPDI acts as the plant designer.
Project in the Business Area: Solar Thermal Power Plants and Industrial Processes, Topics: Concentrating Solar Collectors, Duration: 01/2020-06/2021
more infoFARO®Trek 3D Laser Scanning Integration with FARO® Focuss Laser Scanner in combination with the Boston Dynamics Spot® Mobile Robot allows automated measurement of even complicated terrains. Testing of the application is planned in the HelioSense research project.
Project in the Business Area: Solar Thermal Power Plants and Industrial Processes, Photovoltaic Topics: Concentrating Solar Collectors, Solar Thermal Power Plants, Photovoltaic Modules and Power Plants Field of Work: Forecasting of Solar Irradiance and Power Duration: 02/2021 - 07/2023
more infoExamples of INSHIP ECRIA-related Research Infrastructures: (a) Power tower test facilities, parabolic trough collector test facilities with thermal oil and with direct steam generation (CIEMAT), (b) Design and 3D prototype printing (Cranfield University), (c) Deflectometry-based optical characterization of solar concentrators (Fraunhofer ISE), (d) High-flux solar simulator (ETH Zürich), (e) SOPRAN test facility for pressurized water or direct steam generation (DLR).
Project in the Business Area Solar Thermal Power Plants and Industrial Processes; Topics: Thermal Systems Engineering, Concenrating Solar Collectors, Thermal Storage for Power Plants and Industry, Solar Thermal Power Plants, Duration: 01/2017 - 12/2020
more infoPresentation of the JUMBOTROUGH solution (right) in comparison to the state of the art production (left).
Project in the Business Area: Solar Thermal Power Plants and Industrial Processes, Topics: Concentrating Solar Collectors, Solar Thermal Power Plants, Duration: 12/2019 - 05/2022
more infoProject in the Business Area: Solar Thermal Power Plants and Industrial Processes; Topic: Concentrating Solar Collectors; Duration: 01/2019 - 12/2023
more infoSecondary Reflectors for Solar Power Tower Receivers
Trial prototype secondary reflector channel after 2500 h in 400 °C oven.
Project in the Business Area: Solar Thermal Power Plants and Industrial Processes, Topic: Solar Thermal Power Plants, Duration: 5/2019 - 4/2021
more infoFirst commercial CSP power plant in China: 50 MW CGN Delingha with 9h storage and 9120 EuroTrough collectors, technology supplier and technical support: sbp sonne.
Project in the Business Area: Solar Thermal Power Plants and Industrial Processes, Topic: Concentrating Solar Collectors, Duration: 5/2019 - 4/2022
more infoIm Projekt betrachtete CSP Kraftwerkskomponenten. Vorne das Parabolrinnenfeld – die Wärmequelle und in der Mitte das Trockenkühlsystem – die Wärmesenke.
Project in the Business Area: Solar Thermal Power Plants and Industrial Processes; Topic: Concentrating Solar Collectors; Duration: 10/2021 - 03/2024
more info